One side of the basis cage should be parallel to the edge of the road.
Street light pole installation procedure.
Installation procedures for a solar street lamp 1.
Below are some led street light installation guides and maintenance procedures for your guidance.
D steel street light poles power installed screw bases e16 18 2 rocky road recycling 4154 mcgillvary blvd winnipeg manitoba contact.
The position of the street light poles shall conform to standard drawings 5 5a through 5 8.
Installation of the foundation.
Site engineer electrical has to ensure that all the lighting fixtures are received at site of latest revision.
Led street light pole installation procedure there are 6 in stallation procedures of led street lamp pole for your reference.
1 0 check procedure for supplied joined sections 1 1 the pole sections may be supplied joined by ingal eps or may require on site joining.
Pole height also depends on a number of factors.
A professional evaluation should be carried out to ensure your poles adhere to local codes and are able to withstand the weather conditions of your location.
Constructing a concrete base for a parking lot pole light.
Ensure the mode switch is set to on and insert the rubber plug security screw.
Although led street lamp has a long lifespan it is consumable if you want to prolong its service life it should be regularly maintained and kept in good repair.
Lamp wattage pole spacing the distance between poles light intensity and area illumination must all be considered.
Street lights on existing utility owned poles where there are permanent existing or necessary planned utility owned poles adjacent to the roadway the street lights may be installed upon the utility pole in lieu of the required street light poles.
Generally joined sections.
The purpose of this technical instruction is to detail those actions necessary to ensure that street lighting columns are joined in compliance with the applicable design standards.
Mount the street light on the pole as shown below and correctly align with the road 3.
Screw and secure the basis cage to the ground using the four screws.
With the screws supplied fix the light to the pole 5.
A concrete precast poured in place e16 19 reclaimed street light poles shall be disassembled by removing the davit arm and at all tenon joints.
Installation procedure for light fixture installation works shall be carried out only with respect to approved shop drawings of latest revision.
Firstly we contact with the departments of the pipeline to understand the approximate distribution of underground cables and knowing the detailed division of underground pipelines through excavation channels.