The clearcast forms difference.
Stay in place concrete bridge deck forms.
Stay form is the most cost effective solution for forming bulkheads tunnels or any below grade structure.
Bridge form and highway products.
Stay form is heavily used as a bulkhead form and being lighter than plywood or steel sheeting is easier and faster to place.
Scaffolding and underside shoring become unnecessary as does the need for any removal of wood forms.
Are slightly different than what was shown on the as built drawings and additional material is required after the bridge deck has already been removed with a timeline for construction.
The metal bridge forms are designed on the basis of dead load of form plus wet weight of reinforced concrete at 240 kg m3 150 pcf plus 2 4 kpa 50 lb sq ft for construction loads.
Uniform slab depth can be more easily achieved and the waiting period needed to remove wood forms after the concrete has set is eliminated.
Suitable for new bridge construction and rehabilitation bridge dek stay in place deck forming systems offer your project ease and speed of construction safety durability and longevity.
Transparent stay in place form technology truetech bridge is a national provider of engineered bridge systems for the heavy highway industry.
Using stay in place forms can greatly reduce both the cost and time of forming bridge deck slabs.
The unit working stress in the steel will not be more than 0 725 of the specified minimum yield strength of the material furnished but not to exceed 250 mpa.
Steel grid bridge and aluminum decking bridge forms and railings.
Ends of corrugations are factory closed or crimped to prevent leakage of concrete.
Bridge dek is made of high strength galvanized steel to meet design requirements of steel and concrete bridge structures.
Stay in place metal bridge forms.
All products can be used in alternative applications.
At d mac industries we provide you with same day steel deck solution so that you can week your project moving.
Figure 2 1 1 typical deck form support for a concrete box girder bridge 2 1 figure 2 1 2 typical deck sheathing supports on a concrete box girder bridge 2 2 figure 2 1 3 stay in place metal forming on a precast girder bridge 2 3 figure 2 1 4 example of a slab bridge 2 4 figure 2 1 5 example of a steel girder bridge 2 4.
Our clearcast form system eliminates the time and risk of stripping removable forms while enabling inspection for the life of the bridge deck.
Our transparent stay in place deck forming system is the result of years of research and development yielding an innovative method of bridge deck construction that improves productivity and safety while complying with bridge owner inspection criteria.